Twenty years of projects across Los Angeles. Real case studies with photography as current projects wrap. Below is representative work — the kinds of projects PBG builds, the scopes we run, and the shape of the work.

Representative scope · Los Angeles County

Whole-home remodel

Down-to-studs remodel on a 1970s mid-century residence. Structural upgrades, seismic retrofit, full MEP replacement, kitchen and bath redesign, envelope insulation upgrade, standing-seam roof replacement with integrated solar mounting, 8 kW PV array, 10 kWh battery.

Typical build window: 10–14 months from permit issuance.

Representative scope · Los Angeles County

Custom home

Ground-up single-family on a hillside lot. Grading, retaining walls, mat foundation, three-story steel-and-wood framing, high-performance envelope, standing-seam roof, 12 kW integrated PV array, 20 kWh battery, EV-ready main service panel at 400 A.

Typical build window: 18–22 months from permit issuance.

Representative scope · Los Angeles County

ADU

Detached two-bedroom ADU on an infill lot. Utility separation from primary residence, spread footing foundation, framing, MEP, envelope, composition roof with integrated 4 kW PV, 5 kWh battery.

Typical build window: 10–12 months permit-to-CO.

Representative scope · Los Angeles County

Solar-and-battery retrofit

Solar-and-battery retrofit on an existing residence undergoing roof replacement. Standing-seam roof replacement, 10 kW PV array with panel-level microinverters, 13.5 kWh battery, main service panel upgrade to 200 A, EV charger install, NEM 3.0 interconnection.

Typical scope window: 4–6 weeks from permit issuance.

Representative scope · Los Angeles County

Whole-home remodel + energy retrofit

Combined remodel and full-electrification retrofit on a 1990s residence. Selective demolition, kitchen and bath redesign, heat pump HVAC replacement, induction range and heat-pump water heater installation, 400 A main service panel upgrade, 14 kW PV array, 20 kWh battery.

Typical build window: 12–16 months from permit issuance.

Representative scope · Los Angeles County

Commercial TI

Tenant improvement on a 6,000 sq ft office space — selective demolition, partitions, ceilings, flooring, MEP modifications, ADA-compliant restrooms, break room, conference rooms.

Typical build window: 5–7 months from permit issuance to certificate of occupancy.

Real case studies

Real case studies live here as current jobs wrap.

Real project case studies — with photography, client permission, and full scope detail — go live here as current PBG projects wrap.

We don't publish stock photos as PBG project claims.

Everything you see with a real name and a real address will be a real PBG job.

In the meantime, we're happy to walk you through recent projects on a call.