What we handle
- ADU feasibility review — lot size, setbacks, utility separation, parking implications
- Architect coordination, permit-ready construction documents
- LADBS ADU intake pathway, plan check, and permit issuance
- Utility separation — separate electrical service, plumbing, gas where required
- Foundation, framing, MEP rough-in, envelope, roofing
- Kitchen and bath, interior finishes
- Standalone solar and battery integration when the ADU is being built to accommodate future EV charging or off-grid resilience
- Final inspection, certificate of occupancy, punch list, one-year workmanship warranty
Who this is for
- Homeowners adding rental yield to their lot
- Multi-generational families creating separate living for adult children or aging parents
- Property owners doing a JADU conversion inside an existing footprint
Typical scope and timeline
Detached ADUs in LA typically run 10 to 14 months permit-to-CO. Attached and junior ADUs are faster, depending on how much of the existing envelope is being reused. We give you the specific range during the feasibility review, before design starts.