Whole-Home Remodels

Full-scope residential remodels. Down-to-studs, additions, second-story pop-ups. One contractor holding the plan through demo, MEP, and finish.

What we handle
  • Existing conditions survey and structural assessment
  • Architect coordination, permit-ready construction documents
  • LADBS residential remodel plan check, corrections, and permit issuance
  • Selective demolition, structural upgrades, seismic retrofit where triggered
  • Full MEP replacement or upgrade — electrical service, plumbing, HVAC
  • Envelope work — windows, doors, insulation, cladding, roofing
  • Kitchen and bath — cabinetry, plumbing fixtures, tile, stone, appliances
  • Integrated solar-and-battery retrofit when the roof is being replaced anyway (single-contract efficiency)
  • Interior finishes coordinated with the design team
  • Final inspection, punch list, one-year workmanship warranty
Who this is for
  • Owners of homes 20+ years old who want the whole envelope and MEP brought current
  • Buyers of homes that need extensive work before move-in
  • Existing owners planning additions or second-story pop-ups
Typical scope and timeline

Whole-home remodels in LA run 8 to 14 months from permit issuance to punch-list completion, depending on scope, existing-conditions surprises, and finish level. We flag the ranges early and update them as the demo phase surfaces what's actually behind the drywall.

Talk to the operator.

Call (310) 948-7099for a scoping conversation on your project.

Start a remodel project